Solution & Implementation
Expro turned to Furmanite. We offered a world first in engineering design. It brought together hot tapping, leak sealing and double line-stopping technology to enable final tie-ins to be made while the existing piping system remained fully operational and while batches of produced water were diverted for the purpose of commissioning the new IGFU vessel.





![ipsco[1]](http://www.furmanite.com/wp-content/uploads/2013/06/ipsco1.jpg)
![silk[1]](http://www.furmanite.com/wp-content/uploads/2013/06/silk1.jpg)
![trevitest[1]](http://www.furmanite.com/wp-content/uploads/2013/06/trevitest1.jpg)
![furmatech[1]](http://www.furmanite.com/wp-content/uploads/2013/06/furmatech1.jpg)
![fumaseal[1]](http://www.furmanite.com/wp-content/uploads/2013/06/fumaseal1.jpg)
![slm[1]](http://www.furmanite.com/wp-content/uploads/2013/06/slm1.jpg)
![caribbean-inspection-logo[1]](http://www.furmanite.com/wp-content/uploads/2013/06/caribbean-inspection-logo1.jpg)
![2aiausa-logo[1]](http://www.furmanite.com/wp-content/uploads/2013/06/2aiausa-logo1.jpg)
![huntington-logo[1]](http://www.furmanite.com/wp-content/uploads/2013/06/huntington-logo1.jpg)
![agressive-logo[1]](http://www.furmanite.com/wp-content/uploads/2013/06/agressive-logo1.jpg)