Results
Work on both projects was completed ahead of schedule.
Work on both projects was completed ahead of schedule.
That’s where Furmanite Hot Tapping and Plugging comes in. The main goal was to install expansion loops into sections of 10” and 16” flare lines. Having proved our ability on the 10” project, the plugging head provided a 100% seal against the flare gas for six days, we were then appointed to the 16” project.
CUSTOMER: Major operator
The customer wanted to modify their petrochemical plant – but they didn’t want to shutdown.
Specialty industrial service and product solutions provider, Furmanite supplies an ever increasing range of industries with maintenance tools and key engineering services such as leak sealing, hot tapping and line stopping. For comprehensive plant and pipeline maintenance and asset uptime maximization, rely on Furmanite.
Copyright © Furmanite 2012
Pipe Freeze Plugging – Hands-off Valve Operators
Keeping the Oil Flowing…
More First DIY Leak-Sealing Kit
01/01/1924Keeping the Oil Flowing…
More Long Standing RelationshipsKeeping the Oil Flowing…
More Use of Furmanite Leak Sealing Kits
11/01/1926Keeping the Oil Flowing…
More 1st Patent is filed in 1927
01/01/1927Keeping the Oil Flowing…
More Furmanite moves OverseasKeeping the Oil Flowing…
More Costs of a steam leakKeeping the Oil Flowing…
More Furmanite is thinking globalKeeping the Oil Flowing…
More Technology Development
11/22/1934Keeping the Oil Flowing…
More Growing FurmaniteKeeping the Oil Flowing…
More New DirectionKeeping the Oil Flowing…
More Never compromise on the high qualityKeeping the Oil Flowing…
More Best in the business were calledKeeping the Oil Flowing…
More Start of Modern Furmanite
11/22/1991Keeping the Oil Flowing…
More Acquisition-GSG DivisionKeeping the Oil Flowing…
More Corporate Name ChangeKeeping the Oil Flowing…
More Acquisition of SLMKeeping the Oil Flowing…
More